Solastapes Safety Products Light Line LLL
Safesign EEBD Fire Extinguisher TagLock Survival manuals Seal Sprayer GRP Box HHG HRU Fenner Engineering & Software        LLL Measurements Management Software Sign Installation    
 

LLL Measurements

IMO Solas requires the control of your installed photolume Low Location Light systems every 5 years by an accredited service company. In relation to that we write this letter to offer you our services.

                             

T-ISS is a specialist which is certified by DNV for installation, replacement and efficiency measurements  of LLL measurements.

The company’s know how and expertise in this business area, create the possibility for T-ISS to be an excellent guide when choosing new LLL systems, refurbishing them or when you simply want to know how reliable to already installed systems are.

A lot of ferries & cruiseships built before the year 2001 have photoluminescent systems based upon a pigments which used inferior materials. These materials will degrade in time which than makes it necessary to replace the system.

  
     Approved

This means that the glowing performance is fading away through the years and will not work accordingly with the respective regulations 3 up till 5 years after installation.

Therefore, when looking for replacement or installation of new LLL measurements, feel more than free to  contact our team and we will be glad to be of service.

Our service portfolio includes the following:

1: Full detailed inspection & measurement report of PL LLL systems

2: Refurbishment of installed LLL systems

3: Design of new LLL systems for new projects.

   
 

Latest news  |  About Us   |  Products  |  References  |  Details  |  Quality  |  Contact us